Project · New plaza

Cameras and Cabling for a New Golden Gate Plaza

Cable in before the walls closed, cameras up before the first tenant moved in.

★★★★★ 5.0 from 34 Google reviews
Client
Golden Gate
Site
Two-storey plaza, under construction
Trades
Cameras, Cat6
Cameras
Colour turrets and bullets

An empty new building is the easiest target

Golden Gate has had us on six to seven of its plazas. This one was still a site when we started: hoarding up, a boom lift in the lot, no tenants. The cameras are most useful right then, so the job was built around the construction schedule rather than after it.

The order of work

Built around the schedule

  1. Rough-in. Cat6 pulled to every camera position and coiled at the service room while the framing was open.
  2. Walls close. The other trades finish the precast and the stone; our cable is already inside.
  3. Cameras up. Colour night-vision turrets on the panels, bullets on the corners for the lot and the drive lanes.
  4. Tenants arrive. The building has been on camera since before anyone moved in.
During and after

Same plaza, a few weeks apart

During
Finished

The site, then a turret on the finished precast. See the job →

During
Finished

Cable waiting at rough-in, then the bullet on the corner. See the job →

On the building

Turrets on the panels, bullets on the corners

Bullet on the tower
The tower it covers
The service room end
Pulled at rough-in
Next

More jobs

Data, Wi-Fi, music and cameras in before opening day, across three locations.

Five different businesses, one recorder, a camera over every door.

Get a quote

Building something new?

Bring us in at rough-in and the cable goes in once. Call or text 647-864-3117.